50-Bed Student Hostel Facility – Adjumako, Central Region
Problem
A diaspora investor sought to develop a purpose-built 50-bed student hostel adjacent to Adjumako Hospital in the Central Region of Ghana. The project required careful planning to serve the growing student population in the area while meeting hospital proximity requirements and local building regulations.
Approach
S.E.S PMS conducted a full site assessment and feasibility study, coordinating with local authorities and the hospital administration. The team managed procurement, contractor selection, and milestone-based payment releases. Regular site inspections ensured construction quality and compliance with approved drawings throughout each phase.
Outcome
The 50-bed hostel facility was successfully delivered on schedule, providing purpose-built student accommodation near Adjumako Hospital. The project demonstrated S.E.S Group's capacity to deliver institutional-grade residential projects in regional Ghana, supporting both the local student population and the hospital's ancillary housing needs.

Oil Palm Plantation Due Diligence
Problem
UK-based investor required independent verification of 50-acre oil palm investment opportunity
Approach
Land title verification, soil testing, market analysis, financial modeling, risk assessment
Outcome
Identified critical title issues, saved investor from fraudulent scheme

Healthcare Facility Construction Oversight
Problem
Community health center construction required transparent oversight and quality control
Approach
Daily site supervision, materials testing, contractor coordination, progress reporting
Outcome
Facility delivered to specification, now serving 5,000+ patients annually

Student Accommodation Development - Accra
Problem
Diaspora investor needed verified oversight for 24-unit student hostel construction in Accra
Approach
Weekly site visits, contractor verification, milestone-based payment controls, photo/video documentation
Outcome
Project completed on time with 15% cost savings through procurement oversight